  • Vishal Vermahar citeretfor 3 år siden
    Looking at the capital-raising methodologies, we are differentiating between equity capital and debt capital. We are also distinguishing between the digital industry of raising debt as the lending tech market and the digital industry of equity raising as equity crowdfunding.
  • Vishal Vermahar citeretfor 3 år siden
    The entire process is not very transparent, and it is not fully digitized for the end-customer, especially the commercial property loan borrower
  • Vishal Vermahar citeretfor 3 år siden
    The solution for the problems just mentioned is bridging the gap of information between what the customer needs and what the lender is providing
  • Vishal Vermahar citeretfor 3 år siden
    the function within the existing structure that is under attack by technology: the brokering function
  • Vishal Vermahar citeretfor 3 år siden
    home sales
    residential rentals
    pop-up spaces in malls
    commercial properties including office buildings
    all types of raw spaces from warehouses to storage facilities
  • Vishal Vermahar citeretfor 3 år siden
    Computer-Assisted Design allows for a lot of changes and amendments to be visualized before ground is broken, as does factory pre-assembly.
  • Vishal Vermahar citeretfor 3 år siden
    the entire building in the factory and transport it to the land to be placed and used without any further requirement of construction
  • Vishal Vermahar citeretfor 3 år siden
    Some companies go one step further and construct
  • Vishal Vermahar citeretfor 3 år siden
    The construction industry has taken on two new ways to improve the construction process. The first way is copying the automotive industry, which can calculate the cost of building a car down to the penny, mainly because the entire production is happening within a factory, which is lean and automated. This has given rise to the trend in the building industry of constructing parts of the building in a factory, then shifting it to the construction site for installation and final touches
  • Vishal Vermahar citeretfor 3 år siden
    In the past, determining the cost of construction was a matter of experience and estimation. This is not satisfying for an investor with a finance background who would prefer an exact figure for the cost to construct a building. The problem is not that the engineer, architect, or the contractor could not provide an exact figure. Instead, during the construction, any number of variables can change, altering the validity of the initial cost projection